Case study
From a disk array to one drive: a 4K concert archive
54 ProRes camera originals went from 17.8 TB to 5.2 TB. They are still editable, still at their original resolution and frame rate, and once put back at the original path they relink directly, with no paths to re-point.
The project
A 4K cinematic concert project (18 camera positions, 24 tracks of footage), shot on ARRI and Sony cameras. We do not name the project, the client or the files.
Its camera originals were 54 ProRes clips, 17.8 TB in total, kept on a SCSI disk array. Many are long takes: 32 of the clips are larger than 50 GB, and the largest is 1.26 TB.
The goal was to free the array without giving up the edit: every clip kept at its original resolution and frame rate, everything an editor needs to relink kept, and no original deleted until its archive had been checked.
How it was done
- Archive setting. SqueezeReel's archive purpose, encoding HEVC 4:2:2 10-bit in hardware through Apple VideoToolbox. Resolution, frame rate, duration and start timecode follow the source, and the PCM audio tracks are carried over.
- Same names, same folders. Each archive keeps its source's file name and is written to an archive folder beside the source, so the project's folder structure is mirrored.
- A check before anything is deleted. Every clip was checked against its original: picture size, frame count, frame rate, duration, timecode and audio, plus the encoder fingerprint. VMAF was measured on sampled segments and recorded for every clip; on this project it was a review signal rather than a gate, and low scores were flagged for a person to look at.
- Deletion in batches, with a ledger. Originals were deleted in batches of about 1 TiB, and only those whose archive had passed. Before each file was deleted, its sha256 checksum went into a ledger, so every deleted original can still be identified.
- One machine. The whole run went through a single Apple M4 Mac mini, start to finish, from October 14 to October 19, 2026.
Results
| Measure | Result |
|---|---|
| Clips | 54 ProRes camera originals |
| Size | 17.8 TB to 5.2 TB |
| Reduction | 3.5 times smaller, 71% less space |
| Storage | Before: a SCSI disk array. After: fits on one 8 TB drive |
| Checks | 54 of 54 passed the structure and encoder-fingerprint checks |
| VMAF | Recorded for every clip. Median of each clip's lowest segment 94.95; 51 of 54 clips at 90 or above; the lowest, 84.1, is flagged for review |
| Originals | Deleted after their archive passed, in batches of about 1 TiB, each with its sha256 in the ledger |
| Time | 4 days 21 hours, from October 14 at 23:53 to October 19 at 21:06 |
| Machine | One Apple M4 Mac mini |
These numbers are from this one project. Other footage compresses differently; material that is already efficiently encoded shrinks less.
Relinking the project
The archive keeps what editing software uses to find media: the file name, where the file sits among the others, duration, frame rate, start timecode and the audio tracks. That is why the project does not have to be rebuilt.
The archives are written beside the originals, in an archive folder inside each source folder, not over them. Once the archive is put back at the original path, the project relinks directly, with no paths to re-point. A few editors are strict about the file extension (.MOV becomes .mov) and still need one relink; since names and folder structure match, that is one pass for the whole project.
- Once you are satisfied with the archive, move each archive file from its archive folder back into the original folder, under the same name.
- Open the project. The editor finds the clips at their original paths.
- If an editor reports clips missing because of the extension, run its relink command once on the project's top folder: Relink Files in Final Cut Pro, Link Media in Premiere Pro, Relink Clips in DaVinci Resolve.
Relink a few clips and play them through before you rely on the archive for the whole project.
Who this is for
- Post-production houses. Finished projects whose camera originals still fill arrays, kept in a form you can reopen and edit.
- Documentary teams. Long takes and many hours of footage that have to stay usable for later cuts.
- Commercial and studio shoots. Studio sessions shot in ProRes, kept at full resolution for re-edits and cut-downs.
- Game and esports footage. Event recordings and multi-camera captures that pile up season after season.
Running a project like this
The web page takes files up to 5 GB each. A whole-project run like this one, with your folder structure, a ledger and batch deletion, is arranged with us directly.
Write to us about a project archive
For single finished masters, use Project archive on the web.